Train from Palembang to Lombok

Palembang
Lombok, Indonesia

Your cost to travel by Train, bus, ferry: $122 - $150

Palembang
  • Total Distance:

    16.18 km (10 miles)

  • Travel Time:

    17 Minutes

  • Frequency:

    N/A

  • Car Fare:

    6.0 USD (~70,661.4 IDR)

Kertapati
  • Total Distance:

    404.47 km (251 miles)

  • Travel Time:

    9 Hours 32 Minutes

  • Frequency:

    1 Times/Day

  • Train Fare:

    12.0 USD (~141,322.8 IDR)

Tanjung Karang
  • Total Distance:

    5.34 km (3 miles)

  • Travel Time:

    5 Minutes

  • Frequency:

    N/A

  • Car Fare:

    2.0 USD (~23,553.8 IDR)

Bandar Lampung
  • Total Distance:

    260.36 km (162 miles)

  • Travel Time:

    7 Hours 17 Minutes

  • Frequency:

    3 Times/Day

  • Bus Fare:

    13.0 USD (~153,099.7 IDR)

Bekasi
  • Total Distance:

    8.35 km (5 miles)

  • Travel Time:

    11 Minutes

  • Frequency:

    N/A

  • Car Fare:

    3.0 USD (~35,330.7 IDR)

Pulo Gebang Terminal
  • Total Distance:

    1206.22 km (750 miles)

  • Travel Time:

    26 Hours 36 Minutes

  • Frequency:

    2 Times/Day

  • Bus Fare:

    30.0 USD (~353,307.0 IDR)

Terminal Ubung
  • Total Distance:

    10.02 km (6 miles)

  • Travel Time:

    9 Minutes

  • Frequency:

    N/A

  • Car Fare:

    1.0 USD (~11,776.9 IDR)

Sanur
  • Total Distance:

    20.46 km (13 miles)

  • Travel Time:

    31 Minutes

  • Frequency:

    4 Times/Day

  • Ferry Fare:

    22.0 USD (~259,091.8 IDR)

Nusa Lembongan
  • Total Distance:

    82.08 km (51 miles)

  • Travel Time:

    1 Hours 49 Minutes

  • Frequency:

    1 Times/Day

  • Ferry Fare:

    45.0 USD (~529,960.5 IDR)

Lombok
  • Total Distance:

    29.62 km (18 miles)

  • Travel Time:

    28 Minutes

  • Frequency:

    N/A

  • Car Fare:

    2.0 USD (~23,553.8 IDR)

Lombok, Nusa Tenggara Barat, Indonesia
Source: Rome2rio

Train schedule

Departure Arrival Fare Operator Duration
Kertapati Tanjung Karang 12 USD https://kai.id/ 9h 10mins
Bandar Lampung Bekasi 13 USD http://www.damri.co.id 7h 0mins
Pulo Gebang Terminal Terminal Ubung 30 USD https://pahalakencana.co.id/ 25h 35mins
Sanur Nusa Lembongan 22 USD https://rockyfastcruise.com/ 30mins
Nusa Lembongan Lombok 45 USD http://www.scootcruise.com/time-table/# 1h 45mins

Cost by number of pax.

Pax Currency (USD) Currency (Local)
1 person 143 USD ~ 1,684,097 IDR
2 people 286 USD ~ 3,368,193 IDR
3 people 429 USD ~ 5,052,290 IDR
4 people 572 USD ~ 6,736,387 IDR
5 people 715 USD ~ 8,420,484 IDR

Did you know?

  • The total CO2 Emission for your Palembang - Lombok train trip is 87.46000000000001 kg
  • Your total cost to travel by train from Palembang to Lombok is about 143.0 USD (~1,684,096.7 IDR)